Our Office
280, Woodlands Industrial Park, E5 #09-08, Harvest @ Woodlands, Singapore 757322
Email Us
sales1@peggr.com
Call Us
+65 92727529

Why Pixxel for OSM

Creative and innovative design of Civil and Structures by using STADD PRO, TEKLA TSD, TEKLA/CAD/CAM AND OSM/REVIT allow pre-fabrication examination for our clients. This cuts down on post-fabrication alterations, bringing down both cost and time required for projects

We also specialize in design, fabrication and assembly of both standard and custom-made steel structures. These include the design, detailing, fabrication and installation of beams, long span trusses, pillar supports, steel modules, bridges etc. These are specially tailored and custom-made to suit every project we undertake.

OSM - Off Site Manufacturing

Why OSM for projects?

Self Perform facilities in Singapore

Resource availability- span of contro

Enhanced Safety- controlled environment

Quality assurance

Schedule improvements/certainty

Space constraints on site

Fewer resources on site

Cost improvements (determined package by package)

Well established supply chain

Dedicated OSM documentation, processes and SOP's

OSM identification

Utility piping racks

E-Houses

Process skids

Chiller skids and plants

External pipe racks

Valve stations

Utilities skids

Precast and modularized wall systems

Emergency generator and DUPS enclosures

Stainless steel and high purity piping/distribution

Link bridges

Our Prefab MEP Scope



#1
Detailed Engineering


#2
3d Model Coordination


#3
2d Production Dwg and tech submission


#4
Material Procurement


#5
Module Prefabrication and Assembly


#6
Delivery


#7
Marking, drilling, anchoring


#8
Site Installation

DfMA – Prefab MEP

Prefabrication in MEP systems is the practice of manufacturing and assembling components of building services in a factory or other manufacturing site and installing complete modules at the construction site. This assemblies are often known as MEP modules or prefabricated MEP modules.

Construction

Manufacturing

CLASH-FREE MODULE DESIGN




CLASH RESOLUTION ON BIM




ENGINEERED FRAMES AND STRUCTURAL ANALYSIS REPORTS




2D FABRICATION DRAWING




OPTIMISED FINAL MODULE DESIGN


Floor Mounted Pipe Racks


Case study 1 – 80% TIME SAVING THROUGH EFFICIENT INSTALLATION (5 to 6 services)​

DfMA Fabrication and Installation

Traditional MEP Installation​


© Pixxel Engineering Group. All Rights Reserved.